Assume that we are using SJF scheduling and we have the following schedule of arriving transactions and durations:
a. Job A: 1 (arrival time), 10 (duration)
b. Job B: 0 (arrival time), 13 (duration)
c. Job C: 0 (arrival time), 100 (duration)
d. Job D: 1 (arrival time), 15 (duration)